The proposed project will entail the demolition and removal of the concrete deck of the existing South and East Jetty wharf; the installation of soldier pile bulkhead landward of the existing steel sheet pile bulkhead; and removal of onsite stockpiled soil. This removal of the concrete deck is intended to alleviate loading of the wharves’ deteriorated support piles and prevent total failure and impact to adjacent infrastructure.?