Project Description
This Notice of Project Change proposes changes from the last NPC including the identity of the proponent, the staging of the Project development over time, and the gross floor area associated with each stage. The Project is no longer under the direction of the previous proponent, MP MMT Development Co., LLC, and is now under an April 30, 2019 development agreement between Massport and the current Proponent, Pilot Seafood Parcel 5 LLC. With this NPC, the project remains essentially unchanged, with gross floor area of marine industrial use at 211,370 sf with building footprints at 115,270 sf and parking spaces remaining at 165. The Project Site is now proposed to be divided into three subparcels: 5A.1 and 5A.2, and 5B. The northernmost building on the waterfront, 5A.1, will be developed as a two-stage seafood-related building anticipated to be used by Stavis Seafoods. The second stage on adjacent 5A.2 will be another marine industrial building, with Stavis the most likely user. The southern portion of the site, for which no end-user has yet been identified. is anticipated to be developed as marine industrial or ancillary use. In all events, the entire project shall be used only for uses that are fully-compliant with the Ground Lease and Chapter 91 as water-dependent industrial or uses accessory thereto.

Project Phase

Help
  • Letter of Intent
  • Under Review
  • Board Approved
  • Under Construction
  • Construction Complete

STAY CONNECTED

South Boston Waterfront Large Project