CityOfBoston Official An official website of the City of Boston

This is the website for the City of Boston’s new Planning Department, which launched on July 1. The staff and many responsibilities of the Boston Planning & Development Agency have moved to the Planning Department of the City of Boston including planning & zoning, urban design, development review, and real estate divisions. Please excuse any misalignment you may see on our site as we transition to the City. Learn more

Landmark Center Phase III

Landmark Center Phase III

Utilizes hybrid space heating systems that prioritize efficient electric heat pumps to significantly reduce greenhouse gas emissions.

Landmark Center Phase III

Address

421 Park Drive, Fenway

Status

Under Construction

Key Features

Sustainability: Green Building, Zero Net Carbon Building

Team
Development Alexandria Real Estate Equities, Inc. and Samuels and Associates
Architect Elkus Manfredi Architects
Landscape Architect LeBlanc Jones Landscape Architects
Sustainability Consultant The Green Engineer
Permitting, Transportation, Civil Engineering, Cultural Resources, Air/Noise VHB, Inc.
MEP Engineer WSP
Geotechnical Engineer McPhail Associates

Landmark Center Phase III, one of Boston's largest Zero Net Carbon Buildings, is a joint venture between Alexandria Real Estate Equities, Inc. and Samuels & Associates Development, and is part of the larger Landmark Center Redevelopment Project. The new building will accommodate approximately 550,000 sf of office/life sciences uses and a 50,000 sf ground-floor Star Market grocery store.

The project is designed to achieve LEED Gold or better and Fitwell certification. The building utilizes hybrid space heating systems that prioritize efficient electric heat pumps to significantly reduce greenhouse gas emissions. Zero Net Carbon performance is achieved with ~37 kW of on-site solar PV and the commitment to purchase 100% renewable electricity (RECs) and offset any and all fossil fuel carbon emissions. These strategies result in a 42.6 % reduction in GHG and a 50.6% savings in site energy savings compared to baseline and a Building Energy Use Intensity (EUI) of 101 kBtu/sf-yr.

See the Article 80 development project timeline.