CityOfBoston Official An official website of the City of Boston
Spaulding Rehabilitation Hospital

Spaulding Rehabilitation Hospital

Features combine to keep the carbon emissions of the building far below those of most hospitals.

Spaulding Rehabilitation Hospital

Address

300 First Avenue, Charlestown

Status

Completed

Key Features

Resiliency: Sea Level Rise, Resilient Infrastructure

Sustainability: Green Building, Carbon Reduction

Team
Owner The Spaulding Rehabilitation Network
Architect Perkins+Will, Boston and Chicago
MEP Thompson Consulting Engineers
Sustainable Engineering Buro Happold
Landscape Copley Wolff Design Group
Construction Manager Walsh Brothers Inc.

Spaulding Rehabilitation Hospital elevated its first floor as high as possible to prevent against projected sea-level rise; 42” above the current 100-year flood line and 30” above the 500-year flood line. The building achieved LEED V2 BD+C Gold Certification with 44 points out of 69. The highly energy-conserving building envelope, natural daylighting, gas-fired cogeneration system, and other features combine to keep the carbon emissions of the building far below those of most hospitals.

Share This Article:

1-2013AG22-440RE 2013AG13_510-Copy Diagram steinkamp_8854-221_DSC4023